Next-Gen Facilities at the Heart of Singapore’s Maritime Hub

Module & Steel Workshop

Dimension mL x mW Crane Tonnage Unit Height of Lifting (m)
96 x 36 25T Overhead Crane 2 18

A fully covered, weather protected facility designed to ensure consistent fabrication quality. Equipped with two 25-ton overhead cranes for safe and efficient heavy lifting, the space supports the fabrication of structural modules, outfitted blocks and complex steel assemblies

 

Integrated Workshop

The Integrated Workshop delivers a full suite of marine and offshore engineering capabilities under one roof. Purpose built for efficiency and scale, the 8,400 sqm sheltered facility supports structural, piping, mechanical and electrical works with consistent, weather protected quality.

Designed for heavy duty operations, the workshop is equipped with 2 x 20T and 5 x 5T overhead cranes, enabling safe and efficient lifting across diverse fabrication and overhaul activities. From piping, mechanical and electrical works to carpentry and LNG equipment overhaul, the facility brings multiple trades together in a single, centralised space.

Its close proximity to the dry dock enhances turnaround time, while streamlined workflows and cross functional collaboration significantly boost productivity. This integrated approach ensures that every project moves with precision, control and speed.

Workshop Dimension mL x mW Crane Tonnage Unit Height of Lifting (m)
Carpentry 27 x 24 5T Overhead Crane 1 6
Electrical 36 x 24 5T Overhead Crane 1 6
Mechanical 117 x 24 20T Overhead Crane 2 12
Shipwright 36 x 24 5T Overhead Crane 1 6
Piping 81 x 24 5T Overhead Crane 1 6
Piping (Non-Ferrous) 9 x 24 5T Gantry Crane 1 4.5
HSE 18 x 24 N.A.    
LNG 27 x 24

2T Gantry Crane
5T Gantry Crane
5T Overhead Crane

1
1
1

3
6
6

Cryogenics Workshop

This purpose-built LNG workshop spans 648 square meters and is dedicated to servicing and overhauling critical components of LNG carriers and LNG-fueled vessels, including cargo containment systems, pumps, and valves. Equipped with advanced tools and a controlled environment, the workshop upholds the highest cleanliness standards, ensuring optimal performance and durability of LNG system

Progress Status: 70% Lorem isa ipsum dolor sit amet

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Vivamus elementum odio vel mi finibus sagittis. Aenean egestas tempor est, nec molestie ipsum fringilla sit amet. Maecenas sem ante, imperdiet eu sem non, vulputate aliquam felis.

Integer tincidunt, massa et scelerisque consequat, purus mi imperdiet ex, sit amet ullamcorper erat libero vel nibh. Sed id pharetra leo. In et lectus pellentesque, auctor magna quis.